Stonecast Concrete Countertops makes the process of installing new countertops as easyas possible. To get started, we have created this page for you, detailing what to expect throughout your project.
Quotation and Material Selection
experience will help guide you through the design process with helpful advice. Also, we have an abundance of colors and edge molds. One of the best things about concrete countertops are the endless possibilities of designs.
What is Templating?
Scheduling a template
paperwork consisting of:
- Signed job contract showing the details of you job
- Detailed terms and conditions of the sale
- 50% deposit
A responsible party (decision maker) MUST BE ON SITE to confirm all the project details. Any changes made to the job after templating may delay installation and could result in additional charges. To avoid any additional trip charges, please give us at least 24-hour notice if your job is not ready for templating at the scheduled time.
Cabinets that sit directly on your countertops (e.g. Appliance garages, bread boxes, etc.) should be onsite, but not installed prior to template.
experience will help guide you through the design process with helpful advice. Also, we have an abundance of colors and edge molds. One of the best things about concrete countertops are the endless possibilities of designs.
Pre-Template Checklist
ready.
- Countertops or work areas must be cleared.
- The sink and faucet must be present for measuring to occur
- Have cooktop slide -in or
- freestanding range on-site
- Cabinets must be fully installed and level
Adjustments to Quoted Price
installation date. If the issues are not addressed promptly, the installation could be delayed.
IMPORTANT:
(including sink, faucet, cooktop, downdraft, and accessories) must be on-site at time of templating. Other appliances, including dishwashers and refrigerators, should be on site to ensure proper countertop measurements.
Supports
Seams
- Grain direction or “movement” in the countertop
- Actual slab size of the concrete
- Layout of the project
- Fabrication requirements and restrictions
Seams may be visible and noticeable to the touch. However, at Stonecast we can design your countertops to make those seams as inconspicuous as possible. Input from the customer on seam placement is welcomed, and Stonecast will attempt to accommodate those wishes wherever possible.However, final placement of seams is at the discretion of Stonecast Concrete Countertops.
Sinks
The Manufacturing Process
Removing Existing/ Old Countertops
If we are removing your existing countertops, you will need to have the cooktop disconnected prior to our arrival. We are not responsible for any gas, plumbing, or electrical work required to complete the installation of your new countertops.
Rarely, unforeseen conditions arise during tear- out that may result in additional charges. You will be notified immediately if this occurs. Stonecast does not provide any additional labor needed to repair
your cabinets or walls.
If you have existing countertops, and have not contracted with Stonecast for removal, please be sure to have all the work completed prior to our arrival for new countertop installation.
The installation
Most installations are completed within 3-6 hours. However, a second date might be needed to complete installation on jobs that full height backsplashes are ordered because templating them need to be done after the installation of the countertops.
Pre-installation Checklist
- Old countertops must be removed unless your contract includes removal.
- All sink, faucets and appliances must be on site
- Have cooktop, downdraft, slide in or freestanding range on site
- Confirm that sink and cooktop fit within base cabinet
- Items in the lower cabinets removed to protect them from dust or debris
- Cabinets and kitchen floor must be clear of boxes, lumber and other construction debris
- Schedule your plumber and electrician to reconnect plumbing, gas, and electrical, the next
day.
Miscellaneous
- Clear or cover all items from within the lower cabinets
- Please take appropriate measures to protect any sensitive items
- Remove or protect items in areas adjacent to the work areas
- Please have your pets tucked safely away
The installation of your countertops may generate dust. We will try to contain the dust in a reasonable fashion. Also, during installation, the installers will require clear and easy access from the driveway or street to the project area.
Dishwasher Attachment
Paint touch up